I spotted the well masked look of dismay when the engineer opened the utility, whoever had fitted the isolation switch (Not BP) hadn't left much room or cable to work with. The engineer not to be daunted set about the task, the level of communication throughout was first class allowing us plenty of time to save files, etc. before switching off the power. Consulted on the positioning of the various boxes, and cable runs, everything neat and tidy, and a proper clean up before leaving.
3 years ago
bp pulse has a
3.9
average rating
from
4,413
reviews