Login
Start Free Trial Are you a business?? Click Here
Darryl Wilcox
Ordering online was easy. A few simple questions confirmed which EV charger was right for me, and the whole process was fairly routine. Once applied for, a series of installation questions are asked, along with a request for a few photos of the chosen preferred location, meter box, Consumer unit etc to allow for for pre-planning. Mine was a fairly routine installation due to charger location, and the whole thing took about 2.5 hrs to complete. The engineer Stephen was very proficient, and coupled my Solo 3 upto my home wifi router before he left.
1 year ago
Read Pod Point Limited Reviews
Pod Point Limited has a 4.6 average rating from 36,107 reviews