QT2013 NP205 Dummy Idler Shaft Tool
is required to hold the idler shaft bearings, shims, and sleeve together when removing or installing the idler shaft on New Process NP205 transfer cases. An absolute necessity to keep your blood pressure down during a NP205 rebuild! USA Made.
Need More Info?
Use the handy Links below to access over 40 years of Dan's product and vehicle specific Tech Notes to easily get the information you need for your vehicle's repair, maintenance, or upgrade project!
Dan the Gear Man® Tech Notes: Must-Have Tool
To Use
NP200 or NP201 Matching Parts Applications
Tech Note 1: Must-Have Tool QT2013 is the one must-have tool you will need to rebuild your NP205 transfer case. The idler shaft with the bearings, spacer, and shims, must be rolled into the case during reassembly. Keeping all those parts lined up without this tool is difficult to say the least.
Tech Note 2: To Use The QT2013 is a slip fit in the idler bearings so you must support the Dummy Shaft with one hand as you drive in the Idler Shaft. If the tool is not kept in contact with the Idler Shaft, a shim may shift and get caught by the idler shaft.
Tech Note 3: NP200 or NP201 The Idler Shaft Bearings on NP200, NP201, and NP205 Transfer Cases are the same, however, the Idler Gear is wider in the NP205 so this tool will not work in a NP200 or NP201 Transfer Case. For NP200 and NP201, order QT2073.
Tech Note 4: Matching PartsTK50347 Idler Gear BearingTK50346 Idler Gear Bearing CupQU20125 Idler Gear SpacerTKA2053 NP205 Idler Bearing Shim KitQU20126U Idler Shaft CoverQU20127 Idler Gear Shaft Chevy & GMC Shop ManualsDodge & Ram Shop ManualsFord Shop Manuals
Applications: Chevy/GMC, Dodge, Ford
Phone:
406-384-0270
Email:
sales@torqueking.com
Location:
7727 S Leopard Ave,
Billings
Montana
59106