"After remote parking it required a long transit through the airport construction site to the terminal. We entered the border control area which resembles a shed still under construction. Four of the nine Border Control positions were manned. The automatic passport readers were still being installed and were not available. Border Control were very efficient and the waiting time was not excessive. This Border Control area is not welcoming and I wonder what impression visitors to Edinburgh must have when they see this.
"
"The exit from the Plane Parking site has construction work going on right beside it witch temporary metal fence erected. The gap to get through the barrier is too narrow and I damaged my wing mirror trying to getcthrough"